Design a Logo for Project Management Company Critical Path
- Status: Closed
- Prêmio: $90
- Inscrições Recebidas: 4
Síntese do concurso
A logo design is required for a project management company named: Critical Path
Strongly Suggested:
A logo that is legible from a distance
Preferred:
A logo that uses negative space. See the following web page for examples: http://www.boredpanda.com/negative-space-logos/
Not desired:
A detailed logo that must be read from a close distance
SYMBOLISM:
Each of the following are suggestions and are not required:
Incorporate the name or initials
An upward trending arrow or an arrow overcoming, bypassing, or breaking through obstacles/barriers.
Symbol for time
Symbol for savings
Company Slogans under consideration:
On Time, On Budget
On Time, On Budget, On Scope
Guiding You Through
OTOBOS
Critical Path can be defined as:
The longest sequence of project actions which must be completed on time for the project to be completed on time.
An action on the critical path cannot be started until its predecessor activity is complete; if an action is delayed for a day, the entire project will be delayed for a day unless future actions are completed earlier to compensate for the previous delay.
Inspiration Images have been attached.
Habilidades Recomendadas
Painel de Comentários
-
Ismailjoni
- 11 anos atrás
Why not you choose winner? what was your benefit?
- 11 anos atrás
-
yogeshbadgire
- 11 anos atrás
Hey eltorozz, can you tell me the difference between your entry #212 and my #81? The arrow in P is same as mine, the structure and orientation on your logo is same as mine. Alteast could have changes the color you know. Please come up with a different idea or concept man. Don't steal concepts like this please.
- 11 anos atrás
-
karlmc15
- 11 anos atrás
plz re open contest, i want upload ontest,Thanks
- 11 anos atrás
-
nuwangrafix
- 11 anos atrás
Please check and rate #211
- 11 anos atrás
-
nuwangrafix
- 11 anos atrás
Please check and rate #209 #210 # 211
- 11 anos atrás
-
racheelnaik
- 11 anos atrás
CHECK #205 AND #201
- 11 anos atrás
-
raducm
- 11 anos atrás
Please check and rate#172
- 11 anos atrás
-
shravyasingh143
- 11 anos atrás
Hello CH, please check my entry #169. Thank you.
- 11 anos atrás
-
shravyasingh143
- 11 anos atrás
Also check my new entry in this contest #171. Thank you.
- 11 anos atrás
-
abd786vw
- 11 anos atrás
#161
- 11 anos atrás
-
Siddik16
- 11 anos atrás
CHECK PLEASE #141,#143. THANKS..
- 11 anos atrás
-
abd786vw
- 11 anos atrás
#140
- 11 anos atrás
-
mille84
- 11 anos atrás
#130
- 11 anos atrás
-
mille84
- 11 anos atrás
#64
- 11 anos atrás
-
zainulbarkat
- 11 anos atrás
please check #124..thanks
- 11 anos atrás
-
innakosnitska
- 11 anos atrás
Would appreciate your feedback for #114.
- 11 anos atrás
-
v3lily
- 11 anos atrás
Hi, check my design, #120, #121 and #122, you gonna love it.. :)
- 11 anos atrás
-
abd786vw
- 11 anos atrás
#118
- 11 anos atrás
-
asadalirehan123
- 11 anos atrás
please check #116 #117..thanks
- 11 anos atrás
-
ainfantado
- 11 anos atrás
#86 #87
- 11 anos atrás
-
mille84
- 11 anos atrás
#107
- 11 anos atrás
-
Siddik16
- 11 anos atrás
#103
- 11 anos atrás
-
Kavinithi
- 11 anos atrás
Please rate #100
- 11 anos atrás
-
Siddik16
- 11 anos atrás
checkout please #65,#68,#73,#74.thanks..
- 11 anos atrás
-
mille84
- 11 anos atrás
#64
- 11 anos atrás
-
ainfantado
- 11 anos atrás
Hi Sir! #8
- 11 anos atrás
-
alexandracol
- 11 anos atrás
#30 Thanks
- 11 anos atrás
-
abd786vw
- 11 anos atrás
Hi, plz check #27 and rate
- 11 anos atrás
-
asadalirehan123
- 11 anos atrás
sir please check #17 thanks
- 11 anos atrás
Como começar com concursos
-
Publique seu Concurso Rápido e fácil
-
Obtenha Toneladas de Inscrições De todo o mundo
-
Premie a melhor inscrição Baixe os arquivos, é fácil!