Heat Load Calculation Jobs

Heat load calculations are necessary to properly match the equipment capacity to the building requirement. 

Contratar Heat Load Calculators

Filtro

Minhas pesquisas recentes
Filtrar por:
Orçamento
para
para
para
Tipo
Habilidades
Idiomas
    Estado do Trabalho
    1 trabalhos encontrados, preços em USD

    To design a 300 litres per day, operating over 6 hours, Multi Stage Flash Unit ( MSF) evaporator condenser for fabrication for bio medical application.

    $484 - $968
    Secreto ADC
    $484 - $968
    0 ofertas