Carry out a simple insulation coordination study using the EMTP program.

1. Determine the worst-case lightning overvoltage level at the substation following a direct lightning strike to the overhead line at 1500m away from the substation. (use a 1.2/50, 32kA lightning strike.

2. Determine the most vulnerable points at the substation.

3. Using the supplied company specifications and manufacturer data ( buyers’ guide on ABB’s website), select an appropriate surge arrester(s) to ensure protection of all equipment at the substation.

4. Determine the switching overvoltage level for a simultaneous switching at the instant of peak voltage on phase A.

Write a short report summarising your results and showing typical waveforms of the computed voltages for each of the cases above, and give recommendations for overvoltage protection.

Concedido a:

Querendo fazer dinheiro?

  • Defina seu orçamento e o prazo de entrega
  • Descreva sua proposta
  • Receba pelo seu trabalho

Contratar freelancers que também ofereça neste projeto

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online