
Closed
Posted
Paid on delivery
My basement is a clean concrete slab, roughly 530 sq ft, that now needs to be leveled and finished with porcelain tile laid in a straight-lay pattern. Scope of work • Check the slab for high/low spots, then apply the appropriate self-leveling compound so the finished surface is flat and ready for tile. • Supply and install a crack-isolation or uncoupling membrane if your inspection shows it will avoid future movement issues. • Set porcelain tiles (straight lay) with thin-set, maintain consistent joints, and grout neatly. No demolition is necessary; there is no old flooring to remove. • Clean up the site and leave the floor ready for baseboards or trim. Acceptance criteria • Finished floor flat to within 1/8″ over 10 ft. • Uniform grout lines, no lippage beyond 1/32″. • All materials properly bonded and fully cured. I’m ready to select a professional who brings their own tools—wet saw, mixers, spacers, levels—and can start soon. Please outline your timeline, any materials you expect me to supply, and your experience with similar basement jobs when you respond.
Project ID: 40566912
Active 57 yrs ago
Location: Williamsbridge, United States
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs

The Bronx, United States
Payment method verified
Member since Jan 11, 2026
$30-250 USD
$30-250 USD
$2-8 USD / hour
$15-25 USD / hour
₹1500-12500 INR
₹1500-12500 INR
₹1500-12500 INR
$30-250 USD
$30-250 USD
$30-250 USD
$250-750 AUD
$250-750 AUD
$400 USD
$3000-5000 USD
₹25000 INR
$30-250 USD
$400 USD
$750-1500 USD
₹1500-12500 INR
$250-750 USD
$10-30 USD
min £36 GBP / hour