
In Progress
Posted
Paid on delivery
I need a protection coordination study completed in SKM Power*Tools for an existing industrial facility. The single-line diagram is ready; what I’m missing is a clear set of time-current curves, device settings, and written recommendations that will raise our safety margin while boosting overall system reliability. You will begin by importing or building the model in SKM PTW, verifying device data, and then running the coordination module. Please evaluate breakers, fuses, relays, and feeders across the entire plant distribution down to 480 V. Once selective tripping and fault-clearing sequences meet IEEE and NFPA 70E guidelines, document all changes and suggest any hardware or setting adjustments necessary to close remaining gaps. Deliverables: • Native SKM PTW project file with all revisions • PDF report summarizing methodology, findings, and recommended settings • Time-current coordination (TCC) curves for every critical protective pair • One-page executive summary highlighting the safety and reliability gains I will consider the study complete when the curves show no unintended overlap, settings tables are ready for field implementation, and the report provides a concise rationale for each recommendation. If you have recent experience with large motor loads, utility tie breakers, and arc-flash mitigation inside SKM, this will be a straightforward assignment.
Project ID: 40414555
6 proposals
Remote project
Active 2 mos ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs