
Closed
Posted
I have a freshly installed 80 kW/h battery-energy-storage system running through a Solinteg inverter on a three-phase supply. The hardware is in place, wired to the grid and the utility meter, the inverter and battery controller show up on Wi-Fi, yet the whole setup sits in an Idle state and refuses to charge or export. I need someone who has already commissioned this brand of inverter or a comparable hybrid setup to walk me through the parameters, safety flags and grid-code settings that typically block first-time operation. FaceTime is my preferred medium, though if necessary I can jump to WhatsApp or Teams/Zoom. I expect the troubleshooting conversation to last no more than about four hours, possibly split into shorter sessions while I change settings or cycle breakers on site. Success for me is simple: the battery must accept a charge, deliver power back to the loads, and reliably enforce the programmed load-limiting profile across all three phases. Once we see that behaviour in real time and the inverter logs look healthy, the job is done. If this sounds routine to you, let’s schedule a call and bring the system to life.
Project ID: 40234938
8 proposals
Remote project
Active 3 mos ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs