Em Andamento

CIVIL ENGINEERING TASK -1

20 page without calculation .. Those papers should the writer use them for water cement ratio

0.55 normal

0.5 Air -entrained

====================================================

I need this done in 1 week, 27 November

Price : $40

Habilidades: Engenharia Civil, Engenharia

Ver mais: task 1, price engineering, engineering price, assignmentshelp, Engineering civil, engineering writer, mechanical engineering civil engineering essay, adobe air need, civil engineering writer, civil engineering calculation, adobe air need browser, need gold price script, need task done, engineering calculation, virtuemart need variable price product, descon engineering civil jobs, need best price, task engineering company delhi

Acerca do Empregador:
( 647 comentários ) New Delhi, India

ID do Projeto: #5148079

Premiar a:

hasance06

Hi brother,I have checked the [url removed, login to view] is a civil engineering lab report.I can do it successfully.Thanks.

$40 USD em 7 dias
(56 Avaliações)
5.4

2 freelancers estão ofertando em média $40 para este trabalho

ekaina

La propuesta todavía no ha sido proveída

$40 USD in 3 dias
(0 Comentários)
0.0