
Closed
Posted
Paid on delivery
I need to answer a set of City of Atlanta site-development comments so the permit can move forward. Please update my civil plan set and supply any supporting exhibits that will satisfy the reviewer. What must be added or revised • Disturbed area – calculate it and label the acreage on the cover sheet. • Erosion control – draw Sd1-S silt fence and a construction entrance around the entire limit of disturbance. • Impervious replacement – quantify the new sidewalk and driveway surfaces; if they total 500 ft² or more, add stormwater management/Green Infrastructure notes in line with §74-504(b)(1)(2). • Flood information – insert the correct FEMA FIRM panel, then overlay Zone AE and Zone X flood-plain contours with clearly marked elevations. • Compliance – include wording and any design tweaks needed to meet the City of Atlanta Flood-Plain Ordinance §74-205.1 for work inside the mapped flood area. Deliverables 1. Revised PDF plan set (24 × 36) ready for resubmittal. 2. Native AutoCAD Civil 3D 2020 (or later) file. 3. Any calculation sheets or GIS layers used for acreage, impervious counts, or flood contours. One review round with comments is included; I will handle the formal upload to the city once your final files are in hand.
Project ID: 40392415
4 proposals
Remote project
Active 24 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
4 freelancers are bidding on average ₹21,125 INR for this job

Hi, I can help with this revision package. Since the City comments are specific and permit-driven, the key is not just editing drawings, but turning each review note into a **clean resubmittal set** with the required calculations, exhibits, and annotations so the next submission is easier for the reviewer to approve. I can handle: * disturbed-area calculation and cover-sheet update * erosion-control additions (silt fence + construction entrance) * impervious-area quantification and related stormwater / GI notes * FEMA FIRM panel update and flood-zone contour overlays * ordinance-related notes and drawing adjustments for flood-plain compliance * revised PDF set + native Civil 3D file + supporting calc/GIS materials What matters most here is making the response package **clear, traceable, and permit-ready**, not just changing lines on a plan. I’d work comment by comment so every city note is visibly addressed and easy to verify. If you send me the current plan set and the reviewer comments, I can tell you the fastest resubmittal path right away. Best regards. Ankit.
₹12,500 INR in 3 days
1.5
1.5

Hi there, I update civil plan sets to address city comments with supporting exhibits. Here is how we work: After you share the current civil plan set and the city's comment letter, I calculate the disturbed area and label the acreage on the cover sheet. Then I draw Sd1‑S silt fence and a construction entrance around the entire limit of disturbance for erosion control. Next, I quantify new sidewalk and driveway surfaces; if they total 500 ft² or more, I add stormwater management and Green Infrastructure notes per §74‑504(b)(1)(2). I also insert the correct FEMA FIRM panel, overlay Zone AE and Zone X flood‑plain contours with clearly marked elevations, and add the required compliance wording and design tweaks to meet the City of Atlanta Flood‑Plain Ordinance §74‑205.1 for work inside the mapped flood area. Finally, I deliver a revised PDF plan set (24×36) ready for resubmittal, a native AutoCAD Civil 3D 2020 file, and any calculation sheets or GIS layers used for acreage, impervious counts, or flood contours. One review round with comments is included. Ready when you are. Best, Eng. Sibora
₹32,000 INR in 4 days
0.0
0.0

Faridabad, India
Payment method verified
Member since Jan 3, 2023
₹1500-12500 INR
₹1500-12500 INR
₹12500-37500 INR
₹400-750 INR / hour
₹12500-37500 INR
$15-25 USD / hour
€8-30 EUR
₹12500-37500 INR
$25-50 USD / hour
$250-750 USD
₹750-1250 INR / hour
₹750-1250 INR / hour
$250-750 USD
$250-750 USD
$250-750 USD
$15-25 USD / hour
₹1500-12500 INR
$750-1500 USD
₹1500-12500 INR
₹750-1250 INR / hour
₹12500-37500 INR
₹12500-37500 INR
£250-750 GBP
₹12500-37500 INR
$250-750 USD