Find Jobs
Hire Freelancers

planning engineer or project planner

$15-25 USD / hour

Em Andamento
Publicado há mais de 4 anos

$15-25 USD / hour

I need a planning who can guide and consult me to finalise a project plan, I've done most of it but the consultant sent 25 notes, so we have to finish it one by one in this weekend and send it at the end of Saturday, I'm using Primavera I've all documents need The project is just a boundary wall 70000 m2 and Asphat, and some other Electromechanical Items.
ID do Projeto: 22573785

Sobre o projeto

7 propostas
Projeto remoto
Ativo há 4 anos

Quer ganhar algum dinheiro?

Benefícios de ofertar no Freelancer

Defina seu orçamento e seu prazo
Seja pago pelo seu trabalho
Descreva sua proposta
É grátis para se inscrever e fazer ofertas em trabalhos
Concedido a:
Avatar do Usuário
I Can make any tasks related to planning or scheduling as i am a planning engineer and this is my core job description Moreover , I am a PMP Certified and i am a good user of Primavera
$20 USD em 40 dias
0,0 (0 avaliações)
0,0
0,0
7 freelancers estão ofertando em média $19 USD/hora for esse trabalho
Avatar do Usuário
Hello, I’m a mechanical engineer with a project management background in the fields of planning and scheduling projects in the disciplines of mechanical, civil, electrical, and IT projects. I utilize software such as MS Project (All versions), Primavera P3, P6, ProjectLibre, and Excel. I can start project schedules from scratch, create WBS, dependencies, resource loading, and cost loading. Utilizing the CPM method, reporting, analyzing, and claims. I can complete the project for you. Regards, Hany Estefanos
$20 USD em 20 dias
4,9 (31 avaliações)
4,9
4,9
Avatar do Usuário
Hi, I am interested. I am a construction project planner/scheduler who have considerable expertise in Primavera P6 and MS Project. I have these programs in my PC. I would be happy to discuss about your requirement. Regards.
$20 USD em 40 dias
5,0 (10 avaliações)
4,4
4,4
Avatar do Usuário
Mechanical/Aerospace Ing , ML/AI Progammer , i am a Translator ( French and English Spanish ) ,Mechanical Engineer , Entrepreneur, with experience in product design and manufacturing , applied Mechanics , FEA , Machine Learning and Artificial Intelligence , I have worked in the oil and gas industry as a structural Engineer at TechnipFMC and Total My main skills are - FEA in ansys and Abaqus , solidedge , Adams , Nastran CES edupack ( for material selection ) -PRogramming language (C++ , java , C#, PYTHON ) -Product development , Design for manufacturing solid edge , solidworks , Nx , kisssoft for machine elements designs (shaft , axle , gear , pulley, chains , conveyors ....) DFM by Boothroyd Dewhurst Inc Injection molding --Machine learning , Deep learning (Tensorflow , OpenCV , ROS , Matlab) computer vision (Yolov3 , Python
$20 USD em 40 dias
4,9 (6 avaliações)
4,0
4,0
Avatar do Usuário
I am Electrical Engineer, I have experiance of 8 years in Electrical industries HI i will do the work for you in a very good and elegant manner , assign it to me and i will deliveer it very quick
$15 USD em 40 dias
4,1 (2 avaliações)
2,7
2,7
Avatar do Usuário
Hello sir, I am civil engineer. I work for the vinci construction group for 5 years on very large projects. I have the skills to process your project in a timely manner. Thanks for trusting me.
$20 USD em 40 dias
0,0 (0 avaliações)
0,0
0,0
Avatar do Usuário
I work and head construction planning and consultancy of a globally renowned firm and have been executing similar assignment for last 10 years. as part of our analysis, I frequently do this kind of assignment. I hope I can deliver it in considerably low time and as per global standard. regards.
$16 USD em 20 dias
0,0 (0 avaliações)
0,0
0,0

Sobre o cliente

Bandeira do(a) SAUDI ARABIA
Riyadh, Saudi Arabia
5,0
5
Método de pagamento verificado
Membro desde abr. 10, 2016

Verificação do Cliente

Obrigado! Te enviamos um link por e-mail para que você possa reivindicar seu crédito gratuito.
Algo deu errado ao enviar seu e-mail. Por favor, tente novamente.
Usuários Registrados Total de Trabalhos Publicados
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Carregando pré-visualização
Permissão concedida para Geolocalização.
Sua sessão expirou e você foi desconectado. Por favor, faça login novamente.