Encerrado

CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION -- 2

9 freelancers estão ofertando em média $167 nesse trabalho

hany74

Hello, I’m a mechanical engineer with a project management background in the fields of planning and scheduling projects in the disciplines of mechanical, civil, electrical, and IT projects. I utilize software such as M Mais

$140 AUD in 3 dias
(41 Comentários)
5.5
(14 Comentários)
4.9
engrrockyalam

hi there, i am an architect , i have 11 years of experience on house floor plan, foundation plan design with necessary measurement for construction, i have seen your attachment, i am able to do your house floor plan, Mais

$50 AUD in 3 dias
(33 Comentários)
4.4
engselgendy

How ARA YOU? I am PMP-PMI-USA Certified, specialist at project management, expert in Scheduling with Primavera to create schedule and cash flow. I am a civil engineer, construction, class 2004, work as a project manage Mais

$140 AUD in 4 dias
(18 Comentários)
4.0
(1 Comentário)
2.3
raza61

Hi Sir, I will prepare primavera schedule and provide you with clear Tasks and timeline. I am Planner with18 years of experience. I have worked on several project. You can see an example of one of those projects in my Mais

$190 AUD in 7 dias
(0 Comentários)
0.0
pkoutsis22

Highly experienced construction professional with experience in residential buildings in New York City. I can provide you with cost engineering, scheduling, and logistical planning. Please feel free to contact me direc Mais

$140 AUD in 4 dias
(0 Comentários)
0.0
(0 Comentários)
0.0
harikamadduri

Hi, I am a Masters in construction management graduate, working in the construction industry for 2.5 years as an estimator (MELBOURNE). I work on project programmes and cost analysis on a daily basis. I am unable to op Mais

$175 AUD in 5 dias
(0 Comentários)
0.0