This is the project details, ALL steps must be followed correctly.
Parts 1-4 are done and will be sent to you once accepted.
1. Create a Project Scenario
2. Develop a Project Charter
3. Design WBS with about 5 to 6 work packages and create WBS dictionary for any 2
activities in each work package created ( minimum 10 WBS dictionaries)
4. Provide and present the deliverables mentioned in point 5 to 18 mentioned below
Below are the steps that i'll need you to help me complete:
5. Create about 30 to 40 activities and their interdependency for the entire project
6. Create PERT table for all activities identified (show working) with o, m, p, tE, Ϭ, andϬ2
7. Hand-drawn AON Network Diagram (show EST,EFT, LST, LFT, FF & TF) ( Take a picture and send this to me)
8. Indicate the critical path or paths, non-critical paths
9. Create Organization chart for the project including all project team members
10. Construct a Matrix- based chart “Responsibility, Accountability, Consult and
Inform“(RACI) for any five activities identified in point 5. above for the human
resources used in the project team shown in the organization chart in point 9.
11. Create MS Project Gantt Chart (show S-S, F-S, F-F, recurring tasks, split task, Lead &
Lag)
12. Create M/S Project Schedule View
13. Create M/S Calendar for all human resources, min 3 calendars
14. Create M/S Project Resource sheet with Rate Table
15. Create M/S Project Cost View with total cost, baseline and variances. Demonstrate
fixed costs, fixed cost accrual with split view of details view of task form for activities
16. Conclusion
a. State Project Duration,
b. Critical Path/Paths & Non-critical Path/Paths,
c. Total Project Cost, baseline cost and variance. Comment on the project cost
derived and the budget given( baseline)
d. Completion project duration ranges for standard deviation of 1 sigma, 2 sigma
and 3 sigma,
e. Summarize Project & Learning and state your suggestions to improve the
planning of the assigned project with the limitations and constraints given in
the scenario
All these need to be done by 22/7/2017
Hey, I am very much interested in working on your project. I have read the given instruction and will be able to deliver the best . Contact me via chat i for us to proceed
Hi
I am an industrial engineer and have knowledge and experience in project management
I would like to do the project for you
Please feel free to contact me for further details