
Closed
Posted
Paid on delivery
I have the structural drawings for a new water-treatment plant and need an accurate quantity take-off for every RCC component that goes into it. The facility centres on a chemical-treatment line, with chlorine as the primary agent, so all tanks, reaction chambers, beams, columns and slabs tied to that process must be captured in the numbers. Please extract and tabulate: • Concrete volumes and formwork areas • Reinforcement weights with a concise bar-bending schedule • Any embedded items or starter bars that will affect pour sequences I am comfortable reviewing in Excel, but you may build the model in AutoCAD, Revit or any other software you prefer—just share the source file alongside the final BOQ. Quantities must align with IS codes and be broken down by pour location so procurement can follow easily. Send a brief note confirming you can start immediately and the timeframe you’ll need once drawings are in hand; I’ll forward the PDFs and DWGs straight away.
Project ID: 40304061
5 proposals
Remote project
Active 1 mo ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
5 freelancers are bidding on average ₹5,970 INR for this job

Hello! I can start immediately and will deliver a precise RCC quantity take‑off covering concrete, formwork, reinforcement, and embedded items exactly as per IS codes. I will extract all tank, chamber, beam, slab, and column quantities from your water‑treatment plant drawings and tabulate them pour‑wise for procurement clarity. A full BOQ, bar‑bending schedule, and embedded‑item list will be prepared in Excel, with source files from AutoCAD/Revit included. Once I receive the PDFs and DWGs, I will confirm the exact turnaround time based on sheet count and complexity.
₹3,850 INR in 4 days
3.2
3.2

Hi, i am civil engineer with experience of 10 yrs in design,drawing and Boq. I am happy to share the BOQ. Please give the input file. So that we can proceed ahead on this project. I have experience in water treatment plants,STPs and Cooling tower structures.
₹3,000 INR in 4 days
2.6
2.6

I am having an experience in Quantity surveying, BOQ and Cost Estimation. I will provide Accurate Quantity Take off and as per scope of work I will provide Concrete, Formwork and Reinforcement Steel by Excel.
₹9,500 INR in 3 days
0.0
0.0

Hello, I can start immediately on the quantity take-off for your water-treatment plant. With strong experience in RCC quantity estimation and execution drawings, I will accurately extract concrete volumes, formwork areas, and reinforcement quantities directly from your structural DWGs/PDFs, ensuring full compliance with IS codes. I will also prepare a clear bar-bending schedule (BBS) and capture embedded items and starter bars affecting pour sequencing, with quantities systematically broken down by pour location for smooth procurement and execution. Deliverables: Detailed Excel BOQ (concrete, steel, formwork), concise BBS, and source working file (AutoCAD/Revit as required), all structured for easy review. Timeline: 3–5 days after receiving complete drawings, depending on project size and detailing level. Ready to begin as soon as you share the files. Best regards, Sitanshu Sinha Civil Engineer
₹1,500 INR in 7 days
0.0
0.0

Bhubaneswar, India
Member since Mar 16, 2026
₹750-1250 INR / hour
$750-1500 USD
$50 AUD
€8-30 EUR
$250-750 AUD
₹1500-12500 INR
$10-30 CAD
$30-250 AUD
₹600-1500 INR
$30-250 AUD
₹12500-37500 INR
$10-30 USD
$30-250 USD
$30 USD
₹600-1500 INR
₹1500-12500 INR
$15-25 USD / hour
$130 USD
$30 USD
$10-30 USD