Encerrado

Scheduling Procedure (MS Project)

I need a written procedure for prjoect Scheduling

The procedure should describe the following (but not limited to):

* Who gives input and when (Such as PM or CM)

* A monthly cycles on when input is received and when updated schedule is issued and to whom

* A definition of what schedule filters are issued

* A method of how to work the scheduling updates with the contractors schedules on the Blair site

* Use of 3 week look ahead's or similar (if you suggest to do so?)

* Use of metrics (i.e. # of welds, ton's of steel, m's of pipe, cable, # of I/O's etc.). Please suggest what metrics to use and how to collect and report

* Input to monthly report by 10th of each month

* ???? you suggest what else

I can help along the way, I am looking for somone that has a good idea of Scheduling.

Habilidades: Reescrever Artigos, Engenharia, Research Writing, Tradução

Ver mais: look ahead translation, ms project help, steel work, scheduling, Project Scheduling , ms project, pipe steel, steel pipe, written report method, scheduling site, project engineering report, project report engineering, steel project, project report engineering project, engineering project report, suggest project, report definition, good written site project, site scheduling, project cable, looking site contractors, similar ms project, ms project similar, translation contractors, report scheduling

Acerca do Empregador:
( 89 comentários ) Papillion, United States

ID do Projeto: #3009615