
In Progress
Posted
Paid on delivery
Timesheet Project – Scope Summary Overview The master timesheet list is functioning and supports user entry, grid‑based editing, and multi‑row paste. Project lookups and user‑filtered views work as intended. Two columns (Period and Locked?) are currently read‑only and require adjustment. Locking logic has not yet been implemented and forms part of the required development work. 1. Master Timesheet List A single SharePoint list is in place and confirmed working. Users can add entries, edit standard fields, and paste multiple rows in grid view. 2. Project Lists Project data is stored in separate SharePoint lists. The Project field in the timesheet correctly pulls from these lists. 3. User‑Filtered Entry User View correctly filters entries so each user only sees their own data. New entries appear immediately in this view. 4. Locking Past Data A Locked? column exists but is currently read‑only and cannot be set to “Y”. No locking behaviour is implemented. This needs to be developed so admins can lock entries and prevent further editing. 5. Spreadsheet‑Style Entry Grid View is fully functional. Users can edit rows directly and paste multiple rows from Excel. No form‑based entry is required. 6. Dashboard Requirement Hours, Project, and Period fields are present and suitable for reporting. A dashboard showing hours by project and date range can be built once the Period column is editable and locking logic is in place. Required Development Work Column Fixes Make Period editable for users. Make Locked? editable for admins only. Locking Logic When Locked? = Y, the row must become non‑editable for all users except admins. Must apply in both Grid View and Form View. Provide a clear message when a locked row is opened. Admins must be able to unlock entries. Dashboard Build a dashboard summarising hours by project and time period, using the master list as the data source
Project ID: 40757196
21 proposals
Remote project
Active 5 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs

Hello. I understand that you're looking to enhance your SharePoint timesheet system by implementing locking logic and developing a comprehensive dashboard. One key aspect that stands out is ensuring that the locked entries are non-editable, which is crucial for maintaining data integrity. I have experience in developing similar enhancements in SharePoint environments, where I implemented locking mechanisms and created user-friendly dashboards that provided valuable insights into project data. Focusing on the outcome, once these features are implemented, your team will have a seamless experience managing entries and viewing project hours efficiently, leading to improved productivity and accuracy in reporting. What specific metrics or visualizations are you envisioning for the dashboard? Thanks, Artiom.
£10 GBP in 1 day
0.0
0.0
21 freelancers are bidding on average £34 GBP for this job

Your existing timesheet foundation is already solid, and I can focus directly on the missing controls and reporting without rebuilding what is working. I’ll first correct the Period and Locked? column behavior, with Period available to users and Locked? restricted to administrators. I’ll then implement robust locking so a record marked “Y” cannot be modified by standard users through either Grid View or Form View. Locked records will display a clear user-facing message, while administrators will be able to unlock them when necessary. Once the data controls are in place, I’ll create a practical dashboard based on the master list, allowing hours to be analyzed by project and selected date or period range. My experience with SharePoint-based business applications includes list architecture, permissions, Power Automate workflows, customized forms/views, and reporting dashboards. I’ll build the solution around your current setup, keeping the spreadsheet-style workflow and multi-row Excel paste functionality intact. I can take ownership of the full implementation and ensure the final solution is reliable, maintainable, and aligned with the exact user/admin behavior you require.
£13 GBP in 5 days
7.1
7.1

I can complete the SharePoint timesheet enhancements while preserving the existing working grid entry, multi-row paste, project lookups, and user-filtered views. I’ll make Period editable for users and configure Locked? so only admins can change it. I’ll implement the locking logic so entries marked “Y” become read-only for standard users in both Grid View and Form View, with a clear message when a locked record is opened. Admins will retain full access to unlock entries when required. For the reporting layer, I’ll build a dashboard using the master timesheet list to summarize hours by project and selected date/period ranges. I’ll ensure the solution works cleanly with the existing SharePoint structure rather than introducing unnecessary changes. I have strong experience with SharePoint lists, permissions, Power Platform automation, views, forms, and business reporting. I understand the distinction between UI restrictions and actual data protection, so the locking mechanism will be designed to reliably enforce the intended behavior. I’m confident I can deliver these changes cleanly and integrate them into your existing timesheet without disrupting the functionality that is already working.
£15 GBP in 5 days
6.5
6.5

Hi, I'm Denis, a full-stack developer. I've built SharePoint solutions that transform timesheets into actionable reporting dashboards. Your timesheet list has grid entry and project lookups, but two critical pieces are missing: the Period and Locked columns need to be editable, and there's no locking logic to prevent editing past entries. Once in place, you can build the hours-by-project dashboard your team needs. I would start by reviewing your current list configuration and permissions. Then I'll make Period editable for all users and Locked? editable for admins only. Next, I'll implement locking logic so locked rows become read-only across grid and form views with a clear message when someone tries to edit them. Admins retain unlock ability. Finally, I'll build the dashboard using your master list as the data source, showing hours grouped by project and date range. The key challenge is making locking logic work consistently across grid and form views without breaking existing paste functionality. I'll use SharePoint column validation and conditional formatting to enforce this, then test thoroughly with both entry methods. The existing grid view might interact unexpectedly with new permissions, so I'll validate your current setup early and confirm all edge cases before finalizing lock rules. I'm ready to start right away. Let's connect and discuss the details. Thanks, Denis.
£10 GBP in 1 day
5.7
5.7

Hello, I can modify the SharePoint timesheet to make the Period and Locked columns editable while implementing proper locking logic to prevent unauthorized changes. I’ve updated a similar SharePoint list for a client—made the Status column editable while adding validation to prevent invalid entries, which reduced support requests by 30%. I’d approach this by adding a workflow that checks permissions before allowing edits, then locking rows with a simple JavaScript check to disable controls. The biggest improvement will come from making the dashboard filterable by period and project. Proper locking will ensure compliance while keeping the interface intuitive for users. This setup will let managers review hours accurately and prevent accidental edits. I’ll also provide a training guide for admins on how to use the locking feature. Once the project is complete, I’ll walk through the new functionality with you to confirm everything works as expected. If this approach sounds helpful, I’d be happy to discuss the implementation details further. Thanks, Lazar.
£10 GBP in 1 day
5.3
5.3

Hey! We are a team of 62 professionals specializing in SharePoint development and business workflows with 9+ years of experience building permission-based lists, automation, dashboards, and data-entry systems. Here’s how we can help: * Make Period editable while preserving existing timesheet workflows * Add admin-only locking with grid and form protection * Allow admins to unlock entries with clear status messaging * Build project and period-based hours dashboard Could you clarify whether your current lists use Power Apps forms or standard SharePoint forms, and should admins control locking directly from the timesheet view or through a separate management interface?
£20 GBP in 7 days
5.4
5.4

The timesheet list is already live, so this is about layering a dashboard on top without breaking what's working. I would build the reporting views in SharePoint with Power BI or a Lists view, pull hours through a C# flow where needed, and keep it tied to your existing data. Can start today, working version in 3 days. The budget and timeline here are rough starting points based on the summary, we will firm them up once I see the actual list structure. Want to jump on a quick call?
£20 GBP in 4 days
4.2
4.2

Hi I can enhance your SharePoint timesheet system with streamlined workflows, intuitive interfaces, automated calculations, improved reporting, and reliable functionality tailored to your business requirements. Kundan
£15 GBP in 7 days
2.6
2.6

Hi, your timesheet needs trustworthy locking and a dashboard that reflects editable periods, without disrupting the working Excel-style grid flow. I’d first inspect the existing SharePoint list configuration, views, permissions, read-only settings, and form customization. Period would become user-editable, while Locked? would be restricted to admins. I’d implement the lock check in both Grid View and Form View, with a clear message when a locked row is opened and an admin path to unlock it. The failure point here is a locked flag that changes visually but still permits edits through another entry path. I’d test both paths and verify that pasted Excel rows cannot alter locked records. The dashboard would summarize hours by project and selectable period, using the master list directly. My background includes C# and .NET data workflows, reporting, and business web systems, with careful handling of permissions and reporting data. I have two questions: Q1: Is this SharePoint Online with Power Apps forms, or classic/custom forms? Q2: Should admins be a SharePoint group, or specific users?
£30 GBP in 1 day
2.0
2.0

Hi, Your project doesn't need someone who simply follows the brief. It needs someone who understands what you're trying to achieve and figures out how to get you there. That's how I approach projects. Before writing code or jumping into execution, I want to understand the problem, the goal, and what success actually looks like for your business. I've spent the last several years turning business problems into working digital products, leading developers and designers, managing projects from idea to delivery, and delivering 40+ web and mobile projects. Do I know everything? Absolutely not. But I know how to solve problems. If I don't have the answer, I'll find it. I'll research, learn, test, ask the right questions, and keep working until we have a solution. And once I'm on board: It's our business. Our problem. Our responsibility. I'll give you my honest opinion, challenge ideas when I see a better approach, and never agree just for the sake of keeping things comfortable. I work with clients because I care about building things that succeed. If you're looking for someone who will take ownership rather than simply complete tasks, I'd be happy to learn more about what you're building.
£20 GBP in 1 day
0.0
0.0

Enhancing the SharePoint Timesheet system will be crucial, especially when it comes to making the Period column editable and implementing the locking logic. I’ll handle the development by ensuring both features work seamlessly, paying close attention to user interface clarity so that functionality is right from the start. I’ve worked on similar SharePoint projects, so I know what needs attention, what can easily be overlooked, and where the details matter most. Could you clarify if there are specific reporting metrics you want for the dashboard? I’ll take care of the timesheet enhancement and dashboard creation from the first step through final delivery. Regards, EnriqueHR
£10 GBP in 7 days
0.0
0.0

I’ll make Period editable, add admin controlled locking, and build the hours dashboard while preserving your working grid entry and Excel paste. I’ll enforce locks through permissions and save validation so both Grid View and Form View respect them. The work covers column permissions, locking and unlocking with a clear locked row message, and a dashboard filtered by project and date range. I’ll check that ordinary users cannot change Locked?, locked entries reject their edits, admins can unlock entries, and dashboard totals match the master list. Which SharePoint version are you using, and what customisation access is available? The $20 covers this scope, written handover notes and one bounded revision. Additional licences and unrelated list changes are excluded. Delivery is two days after award, a funded Freelancer milestone, and receipt of required access and materials. Delivery: within 47 elapsed hours (2 calendar days) after funded kickoff and receipt of the required access and materials.
£15.16 GBP in 2 days
0.0
0.0

Dubai, United Arab Emirates
Payment method verified
Member since Oct 8, 2026
£250-750 GBP
£85-120 GBP
$250-750 USD
$750-1500 USD
₹12500-37500 INR
$250-750 USD
₹37500-75000 INR
£5000-10000 GBP
₹12500-37500 INR
$250-750 USD
₹400-750 INR / hour
$10-30 USD
$30-250 USD
₹750-1250 INR / hour
$5000-10000 USD
₹12500-37500 INR
$30-250 USD
$250-750 CAD
$30-250 USD
₹12500-37500 INR