EXPLORE


0.0
0.0
0%
$4 USD / Hour
・

United Arab Emirates (7:58 AM)
・
Joined on January 14, 2010
$4 USD / Hour
・
Area of Expertise includes FEED & Detail engineering in EPCM Environment. Develop Heat & Mass Balance using HYSYS / PROMAX, PFD’s, P&ID’s, Hydraulics, MSD’s, HAZOP study participation. Develop process conceptual study, perform process calculation and prepare study report. Performing relief system design, including PSV sizing, Flare hydraulics and Radiation analysis Preparation of various engineering deliverables (Drawings & Documents) such as Process Flow Diagrams, P & I Diagrams, Process Datasheets, Equipment Specifications, Cause & Effect Diagrams, control philosophies, shutdown philosophies, HAZOP Studies & reports, Operation & maintenance manuals etc. and providing necessary engineering. Preparation of utility summary, effluent summary and material selection diagram. Preparation of Process documents & verifying Process calculations. Process simulation Software’s – HYSYS / PROMAX (Advanced). Heat Exchanger Design Software – HTFS from Aspen / HTRI (Design & Rating).
No reviews to see here!
Experience
Process Lead
Oct, 2014 - Present
•
11 years, 7 months
Bellelli Engineering S.P.A
Oct, 2014 - Present
•
11 years, 7 months
Projects: 1. On-Shore – Fuel Gas Conditioning Skid, IOOC (End User) – RASMARA (EPC), Iran 2. Off-Shore - Gas Dehydration using TEG and TEG Regeneration system for LAYANG FPSO PROJECT, Nippon Oil & Gas, Japan (End User) – THHE (EPC), Malaysia. 3. On-Shore–Project:UCH-II,GasDehydrationUsingMolecularSieves,OGDCL,Pakistan. Gas Sweetening Project Using MDEA Hybrid Solvent, OGDCL, Pakistan. 4. FingerTypeSlugCatcher,Peru,USA. 5. Cyclone & Hydro-cyclones performance design and Fabrication – SOCAR, Italy
Oct, 2014 - Present
•
11 years, 7 months
Process Engineer
May, 2014 - Sep, 2014
•
4 months
Aker-Kolon Processing ltd
May, 2014 - Sep, 2014
•
4 months
Projects: 1. On-Shore – Fuel Gas Conditioning Skid, Jijel & Biskra Power Plant, Algeria (SPE SPA -End User) – Hyundai (EPC). 2. Offshore – Gas Dehydration Using TEG, Moho Nord, Congo. 3. Development and Design of Indirect Water Bath heater with Smokes Tubes in order to make More Efficient and economic Indirect Water Bath Heater.
May, 2014 - Sep, 2014
•
4 months
Process Project Engineer
Aug, 2013 - Apr, 2014
•
8 months
Technical Parts Est.
Aug, 2013 - Apr, 2014
•
8 months
Projects: 1. Chemical Injections Packages for ADCO & KNPC Client meetings for Technical document approval, Preparation of Technical datasheets for Pumps, Valves, Instruments, Flow meters, Electrical list, Line list and valve list. Preparation P&ID, selection of regulating valves, sizing and datasheet preparation regulating valves, Review of GA drawings, Isometric drawings, Mechanical and structural calculation from Vendors.
Aug, 2013 - Apr, 2014
•
8 months
Education
Jaypee University of Information Technology
2005 - 2009
•
4 years
B.Tech

India
2005 - 2009
•
4 years
Qualifications
Associate Member
2016
ICHemE
Associate Memebership of ICHemE
2016
Verifications