Modelling simulation using tecnomatix plant simulation 15

Encerrado Postado há 2 anos Pago na entrega
Encerrado Pago na entrega

Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.

Manufacturing Engineering

ID do Projeto: #30620675

Sobre o projeto

1 proposta Projeto remoto Ativo em há 2 anos

1 freelancer está oferecendo em média $200 para esse trabalho

wtomazini13

Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks

$200 USD in 10 dias
(0 Comentários)
0.0