AutoCAD, 3Ds Max, Revit, Navisworks, Staad Pro, AutoCAD Civil3d, AutoCAD Map3d, Sketchup,Estimations and Scheduling (MS Project, Primavera P6 and Risk Analysis, Suretrack),Field Survey, ArcGIS, Unity 3d, Vuforia, ARcore, Virtual and Augmented Reality,C/C++, Microsoft Office, Adobe’s Softwares, MIS Platform PowerApps.
Implementing BIM, Lean Project Management Practices and other tools on projects as a Developer in house team.
Timely decision making and customer experiencing (Sales and marketing) - VR, AR
Design Coordination - BIM Model, Vehicle simulations, Clash detection, 4D-5D simulations
Planning - Site logistics Model with simulations, Master and Micro schedules, Quantity takeoff and Budgeting, Cash Flow (Automated)
Analysis - Site Logistics Simulations, Value Management, Planned vs Actual simulations, VSM
Monitoring and Controlling - DPR, WPR, MPR, Site Registers, Anticipated Cost Report (Automated)
Handover - As Built Model with gaming experience to society and model placed on google earth
All reports and documents are been optimized, automated and digitalized to make the procedures as lean as possible.
Interlinking of reports to automate the system and introducing one point of contact system for information sharing.
[login to view URL]
[login to view URL]