Imagem de perfil de haidershaw
@haidershaw
Bandeira de Pakistan Mansehra, Pakistan
Membro desde 17 de abril de 2017
2 Recomendações

haidershaw

On-line Offline
I am an Industrial engineer, with an experience of over two year in production planning and control, quality assurance, line balancing, AQL audits, Lean thinking in manufacturing and implementation of six sigma. I have also worked as an article writer, company profile writer, blogger, and reviewer. I am also a lyricist (Urdu language). You can check my portfolio for article samples.
$20 USD/hr
21 comentários
3.8
  • 91%Trabalhos concluídos
  • 100%No Orçamento
  • 100%Pontualmente
  • 26%Taxa de Recontratação

Portfólio

Comentários recentes

Experiência

Company Scretary

May 2017

It has been a wonderful experience working with Xeros. Xeros emerged as a startup, incubated by Technolgy and Business Incubation Center, at University of Engineering and Technology Peshawar, and it has come a long way since then. What I love about my job, are limitless opportunities that we create for our Business Support services.

Director/Coordinator

Jul 2016 - Apr 2017 (9 months)

Skyhigh Institute of Knowlege and Leadership is one of the leading Secondary School in Mansehra, started under the leadership of Mr. Bilal Haider and Mr. Talal Haider. I was responsible to coordinate the teaching staff and make sure that educational standards are not to be overlooked.

Production Planning and Control MAnager

Jan 2015 - Jun 2016 (1 year)

I joined HLG's boot department as production planner and moved to production control. In my time with the department I worked extensively to implement the concepts of Lean manufacturing and six sigma. I worked with VMS, AQL Audits, Quality assurance and process development for the manufacturing of safety shoes.

Educação

Bachelors of Industrial Engineering

2010 - 2014 (4 years)

Publicações

DEVELOPMENT OF OPTIMIZED MAINTENANCE SYSTEM FOR VEHICLE FLEET

Vehicle fleet holds a firm ground in both manufacturing and service industry. Maintenance of vehicle fleet is critical in terms of cost, availability and customer satisfaction. The major cause for delays is inefficient and ineffective maintenance procedures. The research proposed a maintenance system that integrates the flow of information by incorporating different maintenance strategies.

Certificações

  • US English Level 1
    90%
  • Preferred Freelancer Program SLA
    84%

Verificações

  • Conectado com o Facebook
  • Freelancer Preferencial
  • Pagamento Verificado
  • Telefone Verificado
  • Identidade Verificada
  • E-mail Verificado

Minhas habilidades principais

Procurar Freelancers Similares